There’s a Bear in There
Posted On 4 September, 2019
Another week and so much progress has been made. The roof is on and both side walls have been clad. The electrics and insulation are being worked on now.
The interior cabinetry has mostly been fitted out.
The airbag suspension has arrived and been installed.